The development of an AIS includes five basic phases: planning, analysis, design, implementation, and support. The time period associated with each of these phases can be as short as a few weeks or as long as several years.

Planning—project management objectives and techniques The first phase of systems development is the planning of the project. This entails determination of the scope and objectives of the project, the definition of project responsibilities, control requirements, project phases, project budgets, and project deliverables.

Analysis The analysis phase is used to both determine and document the accounting and business processes used by the organization. Such processes are redesigned to take advantage of best practices or of the operating characteristics of modern system solutions.

Data analysis is a thorough review of the accounting information that is currently being collected by an organization. Current data are then compared to the data that the organization should be using for managerial purposes. This method is used primarily when designing accounting transaction processing systems.

Decision analysis is a thorough review of the decisions a manager is responsible for making. The primary decisions that managers are responsible for are identified on an individual basis. Then models are created to support the manager in gathering financial and related information to develop and design alternatives, and to make actionable choices. This method is valuable when decision support is the system's primary objective.

Process analysis is a thorough review of the organization's business processes. Organizational processes are identified and segmented into a series of events that either add or change data. These processes can then be modified or reengineered to improve the organization's operations in terms of lowering cost, improving service, improving quality, or improving management information. This method is appropriate when automation or reengineering is the system's primary objective.

Design The design phase takes the conceptual results of the analysis phase and develops detailed, specific designs that can be implemented in subsequent phases. It involves the detailed design of all inputs, processing, storage, and outputs of the proposed accounting system. Inputs may be defined using screen layout tools and application generators. Processing can be shown through the use of flowcharts or business process maps that define the system logic, operations, and work flow. Logical data storage designs are identified by modeling the relationships among the organization's resources, events, and agents through diagrams. Also, entity relationship diagram (ERD) modeling is used to document large-scale database relationships. Output designs are documented through the use of a variety of reporting tools such as report writers, data extraction tools, query tools, and on-line analytical processing tools. In addition, all aspects of the design phase can be performed with software tool sets provided by specific software manufacturers.

Reporting is the driving force behind an AIS development. If the system analysis and design are successful, the reporting process provides the information that helps drive management decision making. Accounting systems make use of a variety of scheduled and on-demand reports. The reports can be tabular, showing data in a table or tables; graphic, using images to convey information in a picture format; or matrices, to show complex relationships in multiple dimensions.

There are numerous characteristics to consider when defining reporting requirements. The reports must be accessible through the system's interface. They should convey information in a proactive manner. They must be relevant. Accuracy must be maintained. Lastly, reports must meet the information processing (cognitive) style of the audience they are to inform.

Reports are of three basic types: A filter report that separates select data from a database, such as a monthly check register; a responsibility report to meet the needs of a specific user, such as a weekly sales report for a regional sales manager; a comparative report to show period differences, percentage breakdowns and variances between actual and budgeted expenditures. An example would be the financial statement analytics showing the expenses from the current year and prior year as a percentage of sales.

Screen designs and system interfaces are the primary data capture devices of AISs and are developed through a variety of tools. Storage is achieved through the use of normalized databases that assure functionality and flexibility.

Business process maps and flowcharts are used to document the operations of the systems. Modern AISs use specialized databases and processing designed specifically for accounting operations. This means that much of the base processing capabilities come delivered with the accounting or enterprise software.

Implementation The implementation phase consists of two primary parts: construction and delivery. Construction includes the selection of hardware, software and vendors for the implementation; building and testing the network communication systems; building and testing the databases; writing and testing the new program modifications; and installing and testing the total system from a technical standpoint. Delivery is the process of conducting final system and user acceptance testing; preparing the conversion plan; installing the production database; training the users; and converting all operations to the new system.

Tool sets are a variety of application development aids that are vendor-specific and used for customization of delivered systems. They allow the addition of fields and tables to the database, along with ability to create screen and other interfaces for data capture. In addition, they help set accessibility and security levels for adequate internal control within the accounting applications.

Security exists in several forms. Physical security of the system must be addressed. In typical AISs the equipment is located in a locked room with access granted only to technicians. Software access controls are set at several levels, depending on the size of the AIS. The first level of security occurs at the network level, which protects the organization's communication systems. Next is the operating system level security, which protects the computing environment. Then, database security is enabled to protect organizational data from theft, corruption, or other forms of damage. Lastly, application security is used to keep unauthorized persons from performing operations within the AIS.

Testing is performed at four levels. Stub or unit testing is used to insure the proper operation of individual modifications. Program testing involves the interaction between the individual modification and the program it enhances. System testing is used to determine that the program modifications work within the AIS as a whole. Acceptance testing ensures that the modifications meet user expectations and that the entire AIS performs as designed.

Conversion entails the method used to change from an old AIS to a new AIS. There are several methods for achieving this goal. One is to run the new and old systems in parallel for a specified period. A second method is to directly cut over to the new system at a specified point. A third is to phase in the system, either by location or system function. A fourth is to pilot the new system at a specific site before converting the rest of the organization.

Support The support phase has two objectives. The first is to update and maintain the AIS. This includes fixing problems and updating the system for business and environmental changes. For example, changes in generally accepted accounting principles (GAAP) or tax laws might necessitate changes to conversion or reference tables used for financial reporting. The second objective of support is to continue development by continuously improving the business through adjustments to the AIS caused by business and environmental changes. These changes might result in future problems, new opportunities, or management or governmental directives requiring additional system modifications.